★ Movable barricades close when an airplane lands or takes off and shuts down the road each time.
★ The government announced that another road would be built and tunneled under the runway for 350 meters to fix the problem.
★ The government announced that another road would be built and tunneled under the runway for 350 meters to fix the problem.
★ The new road, a dual carriageway, will connect the customs checkpoint with Devil’s Tower Road.